High Volume UPVC Pvc Plastic Extrusion Mold 2316 Steel Construction Industry
Application | Construction | Shaping Mode | Extrusion Mould |
---|---|---|---|
Mold Steel | 2316 | Surface Treatment | Mirror Polishing |
Design Software | ProE | Plastic Material | PVC |
Package | Sterilized Wooden Case | Incoterm | FOB |
High Light | 2316 steel Plastic Extrusion Mold,high volume Plastic Extrusion Mold,construction UPVC pvc extrusion mould |
Construction Plastic Extrusion Plastic Extrusion High-Quality PVC
The extrusion of polymeric materials to produce finished products for industrial or consumer applications is an integrated process, with the extruder comprising one component of the entire line. In some applications, the production lines are very long with numerous operations,
requiring operators to communicate and work together to produce an acceptable finished product.
Parameter
Name | UPVC PVC Extrusion Profile Mould Die tooling |
Brand | Gennki |
Extrusion mould material | 3Cr13,3Cr17,din1.2316 stainless steel |
Mould cavity | one or multi-cavity |
Mould surface treatment | Mirror Polish |
Production machine | CNC |
Profile material | PVC, UPVC, PE, PP, WPC |
Extrusion speed | 3-5 meters per minute |
Testing of extrusion mould | Technicians could be sent to the customer's factory to test the moulds |
Term | Fob |
Frequently Asked Question:
Q1. What is required of RFQ?
1) 3D formats with .stp.(preferred) igs,.prt.
2) 2D drawing for tolerance/material/surface finish/test requirement/regulations
3) Quantity (by order, month and Year)
Q2. How do you ensure product quality?
Gennki applies assessment, planning, monitors every single process. Some bullet points:
1) Apply APQP Product development analysis
2) Lay emphasis on prevention and planning
3) Quality Criteria (ISO and TS 16949)
Q3. How do you ensure on-time delivery?
1) Detailed planning, details per hour/person/machine number/stakeholder…
2) Main material is managed efficiently
3) Daily progress meetings, a recovery plan will be reviewed by the management team once any key chain is a delayed.
4) If a delay happens on delivery in the course, extra hours will help to turn it on schedule
Q4. How can you if we don’t have the CAD data?
Gennki is able to generate the CAD for your review and approval in terms of your 2D sketch, or certain samples.
Q5. Can we test the plastic injection mold?
You are always welcome to the company with us to try the molds in place in person. The testing video can be supplied for your checking with your absence.
Q6. How long does an injection mold last?
Generally, a plastic injection mold could complete anywhere between 100,00 to 1 million (or sometimes somewhat more than a million) cycles in its lifetime, so it's subject to customer’s expectancy.
Q7. How about your guarantee or aftersales?
The worn-easily spare parts will be freely provided during the warranty period. Gennki’s strategic associated American mold shop will assist you to handle the modification change if needed after the delivery.
Q8. How Can I visit your company from abroad?
Easy to find, you may take an international flight either land at PVG Airport or Hongqiao Airport from your workplace. The nearby high-speed train station to Hongqiao Airport will facilitate your trip to elsewhere in China.