EDM Process CNC Milling Parts Parts Wire Cutting Quick Turnaround
Process | CNC Milling, Boring | Additional | Wire Cutting |
---|---|---|---|
Auxiliary | EDM Process | Tolerance | +/- 0.01mm |
Material | Steel, Aluminum, Copper | Measurement | GD&T Standard |
Advantage | Quick Turnaround | Incoterm | FOB / EXW |
High Light | Quick Turnaround CNC Milling Parts,EDM Process CNC Spare Parts,Milling EDM Spare Parts |
High Precision Custom Made Auto Aluminum/Steel/Copper/Brass Parts OEM ODM Service
What you will expect from Gennki is as following, when ordering:
All the parts from Gennki, not exist sharp edge. Holes and screw holes are naturally chamfered for convenient assembly.
The craftsmanship of all parts we machined is controlled rigorously, Every product has been machined following its destined processing procedure.
Every well-experienced staff double-check the program, drawing, and SOP and tools before action;
The operator has to run FA for quality approval before mass production;
The operator has to check every measure once one setup is done to avoid parts scrap in the end.
All staff has been successively in the course of training for quality control and continuous improvement.
Every product will be carefully packed to prevent bump and rust in transit.
Material | Aluminum Alloy: |
5052 /6061/ 6063 /6082/ 2017 / 7075 / etc. | |
Brass Alloy: | |
3602 / 2604 / H59 / H62 / etc. | |
Stainless Steel Alloy: | |
303 / 304 / 316 / 412 / etc. | |
Steel Alloy: | |
Carbon Steel / Die Steel / Spring Steel etc. | |
Other Special Materials: | |
Wide Range for Your Selection. | |
Surface Treatment | Blacking,polishing,anodize,chrome plating,zinc plating,nickel plating,tinting
|
According to customers' specific requests. Match Your Products. | |
Usage | Medical equipment, electronic equipment, communication equipment, semiconductor equipment, mechanical equipment, automation |
equipment, new energy, petroleum, automobile, aviation, motorcycle, bicycle, etc | |
Sample Time and Bulk Time | Sample Time Around 3-7Working Days; High Vloume/ Time Around 8-30Working Days. |
MOQ | 1pcs, Low MOQ to Avoid Unnecessary Waste of Your Products and Money. |
Payment Term | T/T |
Shipping |
By Air or Sea. If Choose by Air, it is Faster Like You Purchase from Local Market.
|
Frequently Asked Question:
Q1. What is required of RFQ?
1) 3D formats with .stp.(preferred) igs,.prt.
2) 2D drawing for tolerance/material/surface finish/test requirement/regulations
3) Quantity (by order, month and Year)
Q2. How do you ensure product quality?
Gennki applies assessment, planning, monitors every single process. Some bullet points:
1) Apply APQP Product development analysis
2) Lay emphasis on prevention and planning
3) Quality Criteria (ISO and TS 16949)
Q3. How do you ensure on-time delivery?
1) Detailed planning, details per hour/person/machine number/stakeholder…
2) Main material is managed efficiently
3) Daily progress meetings, a recovery plan will be reviewed by the management team once any key chain is a delayed.
4) If a delay happens on delivery in the course, extra hours will help to turn it on schedule
Q4. How can you if we don’t have the CAD data?
Gennki is able to generate the CAD for your review and approval in terms of your 2D sketch, or certain samples.
Q5. Can we site-visit to experiment with the finished component?
You are always welcome to the company with us to try the molds in place in person. The testing video can be supplied for your checking with your absence.
Q6. How long does an injection mold last?
Generally, a plastic injection mold could complete anywhere between 100,00 to 1 million (or sometimes somewhat more than a million) cycles in its lifetime, so it's subject to customer’s expectancy.
Q7. How about your guarantee or aftersales?
The worn-easily spare parts will be freely provided during the warranty period. Gennki’s strategic associated American mold shop will assist you to handle the modification change if needed after the delivery.
Q8. How Can I visit your company from abroad?
Easy to find, you may take an international flight either land at PVG Airport or Hongqiao Airport from your workplace. The nearby high-speed train station to Hongqiao Airport will facilitate your trip to elsewhere in China.