EDM Process CNC Milling Parts Parts Wire Cutting Quick Turnaround

Place of Origin China
Brand Name Gennki
Certification ISO9001 / TS 16949
Minimum Order Quantity 1 piece
Price discuss base on certain RFQ
Packaging Details protective film wrapped, and packed in carton or plywood case
Delivery Time 3 days to
Payment Terms T/T
Supply Ability as much as possible
Product Details
Process CNC Milling, Boring Additional Wire Cutting
Auxiliary EDM Process Tolerance +/- 0.01mm
Material Steel, Aluminum, Copper Measurement GD&T Standard
Advantage Quick Turnaround Incoterm FOB / EXW
High Light

Quick Turnaround CNC Milling Parts

,

EDM Process CNC Spare Parts

,

Milling EDM Spare Parts

Leave a Message
Product Description

High Precision Custom Made Auto Aluminum/Steel/Copper/Brass Parts OEM ODM Service

 

 

What you will expect from Gennki is as following, when ordering:

All the parts from Gennki, not exist sharp edge. Holes and screw holes are naturally chamfered for convenient assembly.


The craftsmanship of all parts we machined is controlled rigorously, Every product has been machined following its destined processing procedure.
Every well-experienced staff double-check the program, drawing, and SOP and tools before action;

The operator has to run FA for quality approval before mass production;

The operator has to check every measure once one setup is done to avoid parts scrap in the end.
All staff has been successively in the course of training for quality control and continuous improvement. 

Every product will be carefully packed to prevent bump and rust in transit.

Material Aluminum Alloy:
5052 /6061/ 6063 /6082/ 2017 / 7075 / etc.
Brass Alloy:
3602 / 2604 / H59 / H62 / etc.
Stainless Steel Alloy:
303 / 304 / 316 / 412 / etc.
Steel Alloy:
Carbon Steel / Die Steel / Spring Steel etc.
Other Special Materials:
Wide Range for Your Selection.
Surface Treatment Blacking,polishing,anodize,chrome plating,zinc plating,nickel plating,tinting
 
According to customers' specific requests. Match Your Products.
Usage Medical equipment, electronic equipment, communication equipment, semiconductor equipment, mechanical equipment, automation
equipment, new energy, petroleum, automobile, aviation, motorcycle, bicycle, etc
Sample Time and Bulk Time Sample Time Around 3-7Working Days;  High Vloume/ Time Around 8-30Working Days.
MOQ 1pcs, Low MOQ to Avoid Unnecessary Waste of Your Products and Money.
Payment Term T/T
Shipping
By Air or Sea. If Choose by Air, it is Faster Like You Purchase from Local Market.

 

EDM Process CNC Milling Parts Parts Wire Cutting Quick Turnaround 0EDM Process CNC Milling Parts Parts Wire Cutting Quick Turnaround 1

Frequently Asked Question:

Q1. What is required of RFQ?
1) 3D formats with .stp.(preferred) igs,.prt.
2) 2D drawing for tolerance/material/surface finish/test requirement/regulations
3) Quantity (by order, month and Year)
Q2. How do you ensure product quality?
Gennki applies assessment, planning, monitors every single process. Some bullet points:
1) Apply APQP Product development analysis
2) Lay emphasis on prevention and planning
3) Quality Criteria (ISO and TS 16949)
Q3. How do you ensure on-time delivery?
1) Detailed planning, details per hour/person/machine number/stakeholder…
2) Main material is managed efficiently
3) Daily progress meetings, a recovery plan will be reviewed by the management team once any key chain is a delayed.
4) If a delay happens on delivery in the course, extra hours will help to turn it on schedule
Q4. How can you if we don’t have the CAD data?
Gennki is able to generate the CAD for your review and approval in terms of your 2D sketch, or certain samples.
Q5. Can we site-visit to experiment with the finished component?
You are always welcome to the company with us to try the molds in place in person. The testing video can be supplied for your checking with your absence.
Q6. How long does an injection mold last?
Generally, a plastic injection mold could complete anywhere between 100,00 to 1 million (or sometimes somewhat more than a million) cycles in its lifetime, so it's subject to customer’s expectancy.
Q7. How about your guarantee or aftersales?
The worn-easily spare parts will be freely provided during the warranty period. Gennki’s strategic associated American mold shop will assist you to handle the modification change if needed after the delivery.
Q8. How Can I visit your company from abroad?
Easy to find, you may take an international flight either land at PVG Airport or Hongqiao Airport from your workplace. The nearby high-speed train station to Hongqiao Airport will facilitate your trip to elsewhere in China.